Granite boundary wall and pillars at the James Hutton Institute
We rebuilt a curved granite boundary wall and its entrance pillars for Hunter Construction, reusing and reshaping the existing stone.
- Client
- Hunter Construction
- Location
- Aberdeen
- Service
- Stone Wall Repairs & Rebuilding
- Completed
- June 2024
01
Our scope
Hunter Construction appointed us to rebuild the curved granite boundary wall and associated entrance pillars at the James Hutton Institute in Aberdeen. Our scope was the masonry. The road layout and other external works around it were carried out by others.
Before02
How we carried it out
We recovered the existing granite and reused it in the rebuilt wall, cutting and reshaping the reclaimed stone where needed to suit the new line. The curved wall was set out and rebuilt, the entrance pillars were built up and capped, and the masonry was laid in natural hydraulic lime (NHL) mortar.
Materials
Reclaimed granite from the original wall. Natural hydraulic lime (NHL) mortar.
During03
Completed work
The rebuilt curved wall and entrance pillars, with the pillar copings completed. Completion was confirmed in June 2024.
AfterBefore and after
Before and after
Before
AfterGallery
Project photos
8 photos of the job, in order from start to finish. Select a photo to see it full size.
The start of the job, April 2024.
Recovered granite beside the first section of rebuilt wall.
Rebuilding the wall from the recovered stone.
The curved wall going up, with reclaimed stone ready to be worked.
Progress in June 2024, before the pillar top was finished.
The finished entrance pillar and curved wall.
Closer view of the finished walling.
The rebuilt wall from across the new road.