Two masons building up the blockwork beside a steel column, with block stacks and barrows around them
Commercial

Reinforced blockwork and stone walling at ETZ, Altens

Two masonry packages for Ogilvie Construction at ETZ on Hareness Road: reinforced collar-jointed blockwork and, later, stone boundary walling.

Client
Ogilvie Construction
Location
Aberdeen
Service
Brickwork & Blockwork

Package 1 of 2

Reinforced blockwork

February to April 2025

Ogilvie Construction first appointed us for reinforced collar-jointed blockwork at ETZ on Hareness Road, Altens. The package was completed in April 2025.

How we carried it out

The blockwork was built as two leaves with a mortar-filled collar joint between them, with reinforcement installed to the project requirements.

The completed reinforced blockwork wall inside the unitAfter
The completed blockwork, April 2025.

Package 2 of 2

Stone boundary walling

December 2025

The second package, later in 2025, was stone boundary walling, extending and tying into the existing walls.

How we carried it out

We used stone from the site, built the extensions and tie-ins to the existing walls, and formed the end details. The photographs show the walling being built in December 2025.

Closer view of the stone boundary wallingDuring
Closer view of the stone walling.

Gallery

Project photos

21 photos across 2 packages of work, each in order from start to finish. Select a photo to see it full size.

Reinforced blockwork, February to April 202514 photos

  • Setting out the first course at a steel column.

  • The first courses running the length of the unit.

  • The first courses: two leaves with the collar joint between them.

  • The team building up the blockwork.

  • A full run of blockwork across the back of the unit.

  • Building the two leaves, with the collar joint between them.

  • Reinforcement across both leaves at a steel column.

  • A finished run of blockwork, with neat, even joints.

  • Building up the blockwork.

  • A long run of the wall rising inside the steel frame.

  • The blockwork taken up to the steelwork.

  • The completed blockwork, April 2025.

  • The completed wall, with a forklift for scale.

  • Another view of the completed wall.

Stone boundary walling, December 20257 photos

  • Stone boundary walling, December 2025.

  • Working with stone from the site.

  • Building the wall from site stone.

  • A run of the new stone wall.

  • The length of the wall and its construction sequence.

  • Closer view of the stone walling.

  • The wall progressing beside the site road.

Get in touch

Tell us about your project

Send us a few photos and a short description of the job, whether it's stonework, brickwork or repairs. We'll tell you honestly what it needs, and arrange a visit if it makes sense.

A member of the A.D.I Builders team in a branded hi-vis vest, working on the granite wall of a cottage under the eaves