Patios, paths and steps in Aberdeen

We install concrete, natural stone and porcelain paving, with associated steps, edging and masonry. We agree the layout, finished levels and drainage before laying starts, so the paving works with the house and the surrounding ground.

What we do

What we install

  • Patios in concrete, natural stone and porcelain paving
  • Paths in paving, setts and slabs
  • Stone and granite garden and entrance steps, rebuilt or built new
  • Edging, kerbs and associated drainage
  • Existing paving lifted and relaid, failed bedding repaired and levels improved
  • Garden walls and raised beds

Why a specialist

Why a mason?

Paving lasts when the base, falls and drainage are right. As masons, we build the steps and walls as well as the paving, so they're planned and built to work together.

What we do

What goes under the paving

The parts of a patio that decide how long it lasts are the ones you can't see once it's laid.

  • 01

    A stable base

    Unsuitable material removed and soft or wet areas dealt with before they're covered. Where a granular sub-base is used, our work includes MOT Type 1 placed and compacted in controlled layers, with the depth chosen for the ground, the loading and the paving.

  • 02

    Bedding to suit the paving

    Mortar-bedded slabs get full support underneath, with a compatible bonding primer on porcelain, never isolated spots of mortar. Some concrete slabs have a manufacturer-approved sand-bedded method, so bedding and jointing are selected for the actual product.

  • 03

    Falls and thresholds

    Falls set towards an agreed outlet, and the finished paving checked against doors, damp-proofing, air bricks and drainage openings. A permeable jointing product alone doesn't make the whole patio drain.

  • 04

    Supported edges

    Exposed edges properly supported to help stop slabs moving and bedding escaping, with movement details kept separate from ordinary joints.

Steps, kerbs and adjoining walls are considered together, so a repair deals with the way the entrance or garden is used, not just the appearance of the slabs.

Our process

How it works

Request a Quote
  1. 01

    Look at the space

    We discuss materials, layout, levels and drainage, and agree what you want.

  2. 02

    Written scope

    Showing what is included. If opening up reveals additional work, we explain and agree it before proceeding.

  3. 03

    Groundwork

    Excavation, base preparation and drainage.

  4. 04

    Laying and building

    Bedding, paving, edges, steps and walls.

  5. 05

    Finishing

    Jointing, clean-down and a tidy site.

Areas we cover

Patios, Paths & Steps across Aberdeen and Aberdeenshire

All areas we cover

FAQ

Patios, Paths & Steps FAQs

Get in touch

Got a building job to talk about?

Send us a few photos and a short description of the job, whether it's stonework, brickwork or repairs. We'll tell you honestly what it needs, and arrange a visit if it makes sense.

A member of the A.D.I Builders team in a branded hi-vis vest, working on the granite wall of a cottage under the eaves